Link to NRM Gateway Homepage  Link to public outreach items for Corps visitors  Link to Lake Discovery  Link to Recreation  Link to Environmental Compliance  Link to Environmental Stewardship  Link to Partners  Link Ideas
 Link to News/Current Events  Link to People  Link to Forums  Link to Learning  Link to GETS  Link to Tools  Link to Recent Gateway additions and archive of past postings  Link to Submissions  Link to Gateway Index and Search Engine  Description of tabs and contact information
Communities of Practice
  Black Dot Image
 Small Block
  Black Dot Image
  Black Dot Image
  Black Dot Image Civil Works Flood Risk Management

Business Processes
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
 Black Dot Image
E-mails and Memos


    November 23, 2022
    NOTICE: Bipartisan Infrastructure Law - CHANGE in Project Signage Specifications
    On November 03, 2022 a memorandum was issued to provide guidance on signage requirements for projects funded wholly or in part by the Bipartisan Infrastructure Law (BIL). This email serves to update that guidance based on the “Newer Building A Better America Brand Guide” (attached). This revised, simple standardized sign (also attached) should be easier to produce and can be used without additional modification or customization. The construction identification signs will no longer be used to identify BIL projects.

    Please note the following:

    • Any project that has already procured and installed signage based on the previous guidance does NOT have to remove or replace the sign.
    • Any project that has already initiated procurement with a vendor to produce a sign based on the previous guidance does NOT have to cancel or change the order unless they can do so at a no-cost change.
    • OPMs, during execution of BIL/IIJA projects, will continue to ensure that the requirements for signage displayed by contactors and/or USACE is met.

    Some additional helpful information:

    • This sign may be produced at 2’x3’ size for closer-range pedestrian-only viewers, otherwise the larger 4’x6’ standard spec should be used for viewing from motor-vehicles (or pedestrians at greater distance).
    • No contractor names or logos permitted.
    • A sponsoring local organization or government’s seal can be placed bottom left if necessary (probably infrequent). USACE and Army logo are placed bottom right.
    • It shall be posted in a prominent area near the project/activity.
    • Installation will follow typical installation of Construction Identification signs – two posts and a brace. Since HDO is seldom used anymore, use of a plywood backer behind the panel is a good option for adding rigidity if necessary.

    A copy of the of brand guide along with .jpg, .pdf, and .eps files have been posted to the NRM Gateway at the following link (please copy entire link into your browser):

    Please continue to forward photos of installed signs to Ms. Tara Whitsel, NRM IIJA Program Manager at Tara.J.Whitsel@usace.army.mil, (814)795-4223. You may also contact Tara or Mr. Keith Hyde, National Sign Program Manager at keith.b.hyde@usace.army.mil, (208) 954-7120, with any questions that you may have.

    Thank you for all of your assistance and understanding as work to ensure we are meeting the requirements for appropriate signage of all BIL projects.

    Wishing you all a safe and happy Thanksgiving with friends and family.

    Jeff

    Jeffrey F. Krause
    Chief, Natural Resources Management

    Back to E-mails and Memos